Topographic Survey Projects
Statue of Unity
- Client – Geokno India Private Limited
- Location – Narmadha river bed, Gujarat
- Total Area – 200 acres
- Duration – 1 month
- Services – Topographic survey
The 182m world’s tallest iconic statue of Sardar Vallabhai Patel, “Statue of Unity” was constructed in the middle of the Narmada River facing Sardar Sarovar Dam in Gujarat. RVS helped to complete the topographic survey of 12 km Naramdha River bed within a 1month duration towards the project benchmark. A milestone and turnkey project of RVS having been completed with accurate survey measurements using drone and satellite mode amidst the crocodile zone and rocky surfaces. A worth painstaking effort!


AVT Tea Estate
- Client – Netafim Irrigation India Pvt
- Location – Carmody Goody Estate, Kerala
- Total Area – 370 acres
- Services – Topographic survey
The Carady Goody Estate, Kerala nature fresh zone. RVS team performed the topographic survey in 370 acres of land spread across three hills of God’s own country. The First hill project for RVS, amidst the drastic climatic conditions been successfully completed with excellent support from AVT and Netafim. A memorable journey!
IISc Bangalore
- Client – Geokno India Private Limited
- Location – IISc campus, Bangalore
- Total Area – 198 acres
- Duration – 1 month
- Services – Topographic survey
The Carady Goody Estate, Kerala nature fresh zone. RVS team performed the topographic survey in 370 acres of land spread across three hills of God’s own country. The First hill project for RVS, amidst the drastic climatic conditions been successfully completed with excellent support from AVT and Netafim. A memorable journey!


IIT Palakad
- Client – IIT Palakkad
- Location – Malampuzha Dam, Palakkad
- Total Area – 550 acres
- Duration – 40 Days
- Services – Boundary survey, Topographic survey, DGPS survey
IIT Palakkad around the forest zone of Malampuzha Dam near Kanjikode is another feather on our cap. The real challenging experience for the RVS team is to establish the boundary that has been achieved only on surveying from the Dam. It took 45 days to complete the project against the 30 days schedule due to natural instincts like rain and animal interventions. We are proud to highlight that we bag this project in tender bidding from IIT Palakkad as a result of the credibility we gained through previous assignments.
Tiruppur – Bus Stand
- Client – JLL Property Consultants India Pvt Ltd
- Location – Tiruppur Smart City Project
- Services – Boundary survey, Topographic survey, As-Built survey
JLL Property Consultants India Pvt Ltd a huge international company was taking care of the Tiruppur smart city project. RVS supported JLL to complete the entire As-built survey of the Tiruppur bus stand. Another major contribution to Government projects!


Kasaragod Solar Park
- Client – Jackson Engineers Limited
- Location – Kasaragod, Kerala
- Total Area – 270 acres
- Capacity – 50MW
- Services – Boundary survey, Topographic survey
Kasargod, Kerala a hot hilly terrain with high humidity. RVS had a breathtaking opportunity to complete the survey without proper food and water as the 50MW solar project been implemented in the first of its kind tough hilly terrain. Jackson’s team provided extended support for the successful completion of the project.